JavaScript disabled

This website requires JavaScript to function properly.
Please enable it in your browser and reload the page.

Download EVM Synths Gnome v1.0 VSTi WiN-peace-out | MaGeSY ®™⭐
🎵 MaGeSY® R-EVOLUTiON™⭐⭐⭐


Categories:
  • EVM Synths Gnome v1.0 VSTi WiN-peace-out

    Gnome v1.0 VSTi WiN

    Team peace-out | 04.05.2009 | 6.18 MB

    EVM Gnome is a 2 wave oscillators arpeggiator synthesizer. Gnome by EVM Synths is a Virtual Instrument Audio Plugin for Windows. It functions as a VSTI Plugin

    Feature summary:

    • 2 Oscillators with 71 waveforms in total.
    • 2 State Variable filters.
    • 5 Envelope generators.
    • 4 LFOs.
    • 2 Digital delays.
    • 1 Stereo reverb simulator.
    • BPM gated arpeggiator.
    • XY Mouse Pad controller.
    • A complex modulation matrix.

     

    2 Oscillators with multiple waveforms:

    • Osc 1 variable grade factor synchronized to Osc 1 or Osc 2.
    • Osc 2 Additional subwaves.
    • Osc sync mode.
    • Variable glide.
    • Transpose +/- 2 octaves.
    • Tune +/- 1 semitone.
    • Monophonic / Polyphonic or Multiphonic (unison) modes with Multi Detune.

     

    2 State Variable Filters:

    • Individual Level, Frequency, Resonance (Q), State Ratio and Stereo Pan controls.

     

    5 Envelope Generators:

    • 1 Dedicated Amplifier Envelope Generator.
    • 4 Variable Destination Envelope Generators with 10 Destinations each.
    • Normal or inverted operation.

     

    4 LFOs:

    • 2 Custom waveform LFOs (sine, saw, ramp, 100% pulse, 50% pulse, 25% pulse, fast random, slow random).
    • 2 Standard waveform LFOs (sine, saw, ramp, triangle, pulse, white noise, pink noise).

     

    LCD Modulation Matrix:

    • 8 Internal Modulation choices with 12 Sources + 4 External MIDI controllers
      (LFO1, LFO2, LFO3, LFO4, All LFOs, Mouse Pad X, Mouse Pad Y, Pitch Bender, MIDI CTRL1, MIDI CTRL2, MIDI CTRL3, MIDI CTRL4).
    • Each MIDI CONTROLLER has 128 sources giving a total of 1120 combinations.
    • 32 Modulation Destinations.

     

    2D Vector Mouse Pad:

    • Mouse Pad is full assignable to the Modulation Matrix for both input and output.

     

    Stereo Effects:

    • 2 BPM synced delays for echo, chorus and flanging modes.
    • Stereo Reverb model.

     

    Arpeggiator:

    • EVM Freeform arpeggiator with 4 modes. (up, down, random1, random2).
    • Integrated note timing gate to manipulate arpeggiator BPM timings.
    • Arp BPM time division.

     

    Free Download EVM Synths Gnome v1.0 VSTi WiN-peace-out

    INFO/DEMO/BUY: https://mage.si/bvKiz
    EVM Synths Gnome v1.0 VSTi WiN-peace-out
    🡳 Download 🡳

    19971 Views

    Related ADS:

Submit a Comment or Report Broken Links:

*

*

All comments are moderated. Please write "Links Dead" to report an issue. Reuploads may take 24 to 48 hours.(sometimes longer). You will receive an email notification once the files are available. ☣️ (If there are still working mirrors, we will not reupload the files.)☣️ Please ensure you provide a valid email address; otherwise, your comment may be removed.


⚠️ TRY BEFORE BUY - If you like it, support the developer.
 

ಮ್ಯಾಜೆಸ್ಯ್

MaGeSY ® R-EVOLUTiON™⭐⭐⭐