Muze Eclipse KONTAKT
P2P | 13 May 2022 | 35.7 GB
Muze Eclipse is a huge and inspiring collection of innovative new sounds and atmospheres, textures, pads & synths for music, sound design, and cinematic composition. Developed for use with the full version of Kontakt 5.8 or higher, Eclipse is an all-in-one tool for crafting soundtracks, cinematic music, epic music trailers – in fact, any music that requires powerful, inspirational, hybrid synth sounds.
A Gorgeous Interface
Our completely new engine with a huge selection of effects, built-in arpeggiator, preset selection without the need to use snapshots. All this and much more takes our instruments to a completely new level.SOURCES:
– 216 Sources For Mixing
– 864 Deep Sampled Pad & Synth Patches
– 25920 Sounds to explore & combineQUALITY:
– 24BIT / 48KHZ Quality
– Over 50 GB Content
– Recorded With Digital GearKONTAKT:
– NI Kontakt 5.8 Format And higher
– With NCW Lossless Compressed Samples
– Full Version Required
INFO/DEMO/BUY: https://mage.si/Mh361
Muze Eclipse For KONTAKT
♪ Download FileHosters ♪
♪ Download Torrent ♪
14226 ViewsRelated Articles:







